Principal+Senior Project Manager
Jeff has award-winning attention to detail—literally—he was once recognized for creating the longest RFI ever written by a Project Engineer. Despite a background in design, which includes a BA in Architectural Studies from the University of Washington, Jeff discovered an organizer and planner role fit him best, so he turned his focus to managing the construction process. He joined GLY in 2006, applying his dual strengths in design and project management to our healthcare and life science projects. Away from work, Jeff enjoys playing basketball, running, and hiking with his family.
Principal+Executive Vice President
Tyler’s collaborative approach to problem solving and strong technical abilities have helped him successfully lead some of GLY’s most complex and challenging projects. From redeveloping a waterfront building into a life science research facility with vibration isolation technology to delivering fully integrated hospital expansions in occupied campus settings, Tyler is driven to chart a course for the team to meet the challenges inherent to the built environment. As both a Principal and member of GLY’s Executive Team, Tyler has built a reputation as a committed client advocate and enthusiastic leader who brings out the best in our teams.
Project Executive
HCC
Jon attributes his appreciation of craft and hard work to working as a carpenter for a Spokane-based general contractor while earning a BS in Construction Management from Washington State University. Since joining GLY in 1999, he’s honed his expertise as a healthcare and high-tech office project manager and team builder. When he’s not piecing together complex logistics plans, you’ll find Jon cheering on the Seattle Sounders or casting a line. If he could talk his wife into selling everything and living in a trailer down by the river, he’d be there already.
Design Manager
AIA, Assoc. DBIA™
Andrew spent 14 years immersed in his original calling: Architecture. He found that the most enjoyable and rewarding moments occurred while collaborating with builders. Deciding to blend two passions together—design and construction—Andrew now leverages robust VDC tools to better understand, communicate, and help execute a project’s design intent. Simply put, he constructs the building virtually to iron out any wrinkles before it’s built in the field. Outside the office, Andrew can’t get enough of the mountains. The numbers speak for themselves. He’s made his way to the summit of Mount Rainier via 16 different routes!
Principal+Senior Project Manager
P.E.
Tim spent the first part of his career as a professional structural engineer before arriving at GLY in 2011. He's since completed projects in an array of markets, from healthcare to hospitality, and a long list of high tech corporate campus facilities. On his current project, the University District Station Building, Tim and team are building a 13-story office tower atop Sound Transit's light rail station at NE 45th St and Brooklyn Ave. A former member of the UW track team, Tim traded in his running shoes for hiking boots, and enjoys exploring PNW trails with his wife and two sons.
Project Manager
LEED Green Associate
Since joining GLY in 2017, Benji has distinguished himself as a trustworthy team leader who is continuously learning all he can. He is often the first to arrive and last to leave—by choice!—as he truly enjoys his work and is always willing to take on new challenges, mentor others, and push himself to keep learning and growing. Benji can also often be found biking and enjoying the outdoors.